VideoTriple U Standpipe Deployment
2021
In this training video from Miami-Dade (FL) Fire Rescue, Engine Co. 47, under the direction of Lieutenant Eddie Flores, demonstrates how to configure and deploy standpipe bundles that can be deployed in a limited space. Three 75-foot sections are folded in half and, using a six or eight-foot hook to gauge the bundle's overall length, each half is folded back on itself short of the mid-point that extends as a loop. The couplings line up evenly on the same side of the bundles to facilitate connection.
Once in the training tower, Engine 47's crew deploys three 75-foot bundles. While the standpipe is being flushed, the sections are connected and the three loops are pulled down a hallway or landing about 30 feet deep, each laid on top of the other so the leading sections ride over the loops.
This configuration can be adapted for 2 1/2-inch hose but, regardless of diameter, the hose must be fairly kink-resistant to deploy in such a short and narrow space. Video by Rick Stephens, courtesy of Miami-Dade Fire Rescue.
